nowadays,theautomationsystemofcompositiveandmetricequipme"> nowadays,theautomationsystemofcompositiveandmetricequipme" />

Realize the good way that efficient automation detects

  • Time:
  • Click:100
  • source:ASEM CNC Machining
Normal > nowadays, the automation system of compositive and metric equipment is produced at industry by wide application online. The article adopts the limitation that analyses metric automation, put forward semi-automatic change systematic posture relatively at full automatic change a system to provide cost effectiveness more, be aimed at when producing testing system of online and integrated automation to offer a few proposals. What has the manufacturing environment of automation been no longer new issue. Control system and IT reduced the need that participates in artificially, this fact had existed a few years. And integrated and metric equipment is automation example in relative to newer idea. Through detecting quality conformity enters manufacturing segment, the enterprise is OK benefit from benefit from its detect the promotion of the repeatability in the process detects with what rise efficiency, obtain better process to control thereby. Involve the automation system of compositive and metric equipment, its covered wide potential selection. 3 coordinate gauge automatic mood machine (CMM) , namely those immediate application computers are controlled (DCC) 3 coordinate, had received wide application, automatic below a lot of circumstances 3 coordinate replaced a hand almost completely to move 3 coordinate, its measurement the process is complete by measure a head to be finished automatically, so, automatic 3 coordinate are measured machine it is the process is measured, a choice that guide type assembles the automation system such as treatment. The product quality that the good point that Zuo uses these gather technologies is inferior operation cost, consistent efficiency and promotion. But, more or less is the risk that Zuo uses these automation systems still some. 3 coordinate are measured machine the lamina that measuring outfit clip to go up in tool, the robot that is in charge of assembling and unassemble is outside measuring bonnet. The limitation of automation system although automation system is more and more welcome, but automation system has a few limitation however. Average automation production system uses robot device of convenient workpiece carry automatically. Below certain circumstance, if unmanned value is defended,make, those who make total volume tool is full automatic turning manufacturing unit is the solution with highest efficiency; But fall in most circumstance, a conformity the semi-automatic solution that uses a process automatically with the hand is efficiency however the biggest the solution that change. When the enterprise evaluates the dominant position of these systems, when is needing to consider these systems carefully significant, when be no point, what are relevant risk and accrual. The side that has challenge sex most should belong to the limitation on the technology when implementing these automation projects. In the workshop compositive the 3 coordinate of a high accuracy are measured machine it is unworkable normally, because the workshop has vibration and temperature wave motion,this is. Another confine may be the cycle time that produces unit. Periodic and longer result is Zuo is used semi-automatic change a solution. For example, a workpiece carries a system to judge a robot very hard to whether move 4 times only in the time of a hour. In addition, if unit of a workshop produces the speed of workpiece to be more than metric equipment,detect the speed of workpiece, the likelihood is about to install buffer of a spare parts, in order to be used at containing the part that accept awaits qualitative check. The cleanness that the bigger problem that manufacturer may face still has work, a lot of people had not realized this problem. After the spare parts is machined, can be in its are apparently a few more leftover metallic bits and smeary. Below this condition, the spare parts achieves accurate metric result impossibly, and reduplicative surveys meeting damage 3 coordinate measure the precision of machine. Element of this moment economy begins to act well. Although a lot of people anticipate initiative cost is very high, but they are likely however oversight is all and potential the element of expenditure, for example, may need the buffer that outer garment and spare parts deposit; Because the robot is measured with 3 coordinate,lack reach key software solution; Lack has experience to carry out an engineer; Developing cost is the other factor that must try to consider seriously. To solve afore-mentioned problem, the engineer is improving feasible plan actively, will do it among custom-built program software, software can manage 3 coordinate to survey the newsletter between machine and manufacturing environment among this, make the vivid kinetic energy of workshop spot quite synchronous. Measure machine jacket to carry to 3 coordinate when the robot remove the workpiece, peripheral equipment that goes up with 3 coordinate with discharge (like spare parts clamping apparatus) when interface, intermediate software can carry a system to have news report with workpiece in order to gather environmental information; It manages and show all measurement systematic condition, can tell an user to measure whether undertaking, whether can accuse circularly, whether to stop circularly, or workpiece attribute is good, critical unqualified still wait. Contain 3 coordinate to measure the automation of machine to make unit sketch map. Semi-automatic the dominant position that changes a system has some of time, semi-automatic change a system to be compared even full automatic change a system to provide cost effectiveness more. The goal with any ultimate manufacturer is not a factory is full automatic change, be in however given below conditional parameter, get the biggest efficiency. The target of an easier implementation, not be absolutely focusing at automation, reduce capital expenditure however; For example, an enterprise is OK and efficient run two 3 coordinate to measure machine, do not need 3 to measure machine. In automation and semi-automatic chemical industry carry a system / another cost of elect considers a factor between testing system is labour force. Personnel of 3 high pay, these 3 people can be in charge of respectively process designing, operation and maintain this high-tech system. Although semi-automatic the interpose that the system that change may need staff of level of a hi-tech, but it may be best applied solution. For example, there is tray of 4 spare partses on a conveyer belt, automatic outfit is measuring this conveyer belt on machine. Although a person must place a part to conveyer belt jacket, assure to from beginning to end perch of a component needs check. When 3 coordinate operator goes away because of other job, these component won't be in unwanted position. How to choose correctly to considering those to install testing system and spare parts automation discharge system conformity to reach industry, final decision will be based on applied detail. The clean ability before the complex degree of the precision that element of initiative a few considerations needs to include requirement, workpiece, workpiece detects and first selection technology. CNC Milling