Breakdown analysis reachs hot relay resolve the way to deal with a situation

  • Time:
  • Click:198
  • source:ASEM CNC Machining
Hot relay is enterprise of factories and mines uses one of more general electric equipment, touch the 3 branches composition such as head and behavioral system, re-setting device by heating element, control commonly, it is to rely on by process to have a fever the load current of component spans when allowing a value, the continuance of place happening adds quantity of heat of the eve of the lunar New Year to make behavioral orgnaization subsequently electric equipment of a kind of shelter. The overload that basically is used at electric power to pull idea of report of the shelter in using a system, reach electric to other equipment to have a fever the control of condition, the purpose is to prevent the outfit such as electric thought long serious overload, and the equipment such as caused electric thought all is quickened along ageing, use fixed number of year shortens, even the phenomenon of burn down happens. Does the breakdown with hot common relay include: ? Yan " Jie of  of Huo of ⑽ of  a huge legendary turtle casts  Da to shake encourage a word not χ of Wu of eight of fir of cleanse of head of  of ⑸ of  of  stupid Yu refus of? of grand of Long ┮ charm uses up behavioral cause and countermeasure to heat up the equipment such as relay and electric thought not to match. Rated technology has been worth the eve of the lunar New Year or do not suit, cause hot relay refus is moved. Rated technology parameter should choose afresh. Empty of bolt of the wiring outside hot relay is received, empty solder. Should will outside after wiring total number is checked, had received receive solid. Behavioral electric current rectifies calm value to slant the eve of the lunar New Year, should reasonable key is low make calm cost or change rated electric current is appropriate the hot relay of the requirement. Because bear side short circuit or load current cross the eve of the lunar New Year. Again and again short when too tall or operation frequency is mechanical orgnaization breakdown, make hot relay not active make, cause heat component is burned or sealing off refus is moved. Should change to heat up relay newly, or the hot relay that chooses transformer of electric current of belt speed saturation. Year long disrepair, cause mechanical movement orgnaization and bakelite part wear away. Dirt retention rustily or be out of shape get stuck even. Should repair adjust, but should avoid to heat up relay behavioral feature produces change. Hot relay guide plate emergence, should relay is entered and desired result its are agile. Hot relay can adjust a component, should adjust to the whole place that decide a dot. Hot relay touchs a contact undesirable, should be completely cured touchs dirt of head general situation or oxide to wait. Hot relay is moved the flexibility that hit pole is reduced or disappear, the contact that touch a head do not go up or burn out. Should repair use the rod that touch a head or touch a head, change when need. 2 misoperation rectify calm value to slant small, reasonable increase make calm cost or change rated electric current is appropriate the hot relay of the requirement. Electric thought procrastinates use time too long, should ask to choose to have by electric thought starting time suit but the hot relay of release time progression, or will hot relay is short when starting receive, after starting, eliminate again its are short receive. Operation frequency is too tall, should reasonable choose and restrict operation frequency. Have vibration of intense and exterior concussion. Should adopt vibration isolation measure or choose fight concussion vibratory good hot relay. Reversible movement, receive apply the brake instead or osculant connect. Unfavorable choose bimetallic piece - relay of hot cell type, should convert semiconductor temperature hot relay shelters. Hot relay installs disagreement delimit or all round hot relay temperature and be equiped by shelter all round temperature differs too the eve of the lunar New Year. Should differ setting equipment to furnish proper hot relay by two place temperature. 3 movements are not steady, when slow when fast hot relay is in-house in the orgnaization, individual component becomes loose. Answer to tighten solid component in real time. Electric current is fluctuant too the eve of the lunar New Year, when hot relay adjusts an experiment, electric current is fluctuant too the eve of the lunar New Year or exterior line screw did not screw, the cooling condition difference of every test center, make geminate sheet metal the turn is folded. Answering measure is installation flow straightener, will outside wiring bolt screws, refrigerative condition is concatenate not different, the accuracy of desired result ammeter or change hot relay. CNC Milling